Smart Tvbox GPS Tracker Parts PCBA Board Shenzhen Manufacturer PCB Assembly, PCB Assembly Factory and Contract Assemble

Smart Tvbox GPS Tracker Parts PCBA Board Shenzhen Manufacturer PCB Assembly, PCB Assembly Factory and Contract Assemble

Minimum IC Pitch:0.3mm
Minimum BGA Pitch:0.3mm
Maximum BGA Size:74mm×74mm
Minimum Order Quantity:1 piece
Chat Now

Product Details

To meet the challenge, we are breaking new ground with our Digital Camera Circuit Board, printed circuit board production, circuit board production to enable it to have exquisite design, simple operation and reasonable prices. Love is one of our company's core culture since we believe that only by giving love to our customers and our company can we survive and develop. Our company is committed to the fastest delivery and perfect after-sales service to satisfy customers. Our company has unswervingly carried out its creed: to seek market by virtue and to create great cause by faith. We review the current situation, actively explore new development paths, innovate profit models, and always insist on becoming stronger and growing together with customers.

PCBA Knowledge:

The components on the same PCB should be arranged as much as possible according to the amount of heat generated and the degree of heat dissipation. Components with low heat generation or poor heat resistance (such as small signal transistors, small-scale integrated circuits, electrolytic capacitors, etc.) should be placed in the most Upstream (at the entrance), components with high heat generation or good heat resistance (such as power transistors, large-scale integrated circuits, etc.) are placed at the most downstream of the cooling airflow.

 

In the horizontal direction, high-power components should be arranged as close to the edge of the printed PCB board as possible to shorten the heat transfer path;In the vertical direction, high-power components are placed as close to the top side of the PCB board as possible to reduce the impact of these components on the temperature of other components.

Welcome to use pcb contract assembly services from Linke Electronics.

 

PCBA Process:

图片 2 

 

Our Factory Show:

 

图片 1 

 

Certifications:

Our Company is UL,ISO9001,ROHS and GJB9001B certified. 

 

图片 6 

 

Packing and Shipping:

 

图片 7 

FAQ:

1. How to Get a quotation?

For PCBs,please send us the Gerber File.For PCBA,please send us the Gerber file and BOM(Bill of Materials)

2. What is the MOQ?

No MOQ.1 pcs is ok.

3.What is the lead time?

For PCB orders,the lead time is 2 to 10 days.For PCBA orders,the lead time will be 15 to 30 days.

4.Will the boards be tested before shippment?

Yes,all PCBs will be tested by Flying Probe or E-test.For PCBA,we will have AOI,X-ray,and functional test

Email us to get a quote: admin@brightcircuits.com

 


We are willing to cooperate with you, devote ourselves to the development and application of Smart Tvbox GPS Tracker Parts PCBA Board Shenzhen Manufacturer PCB Assembly, PCB Assembly Factory and Contract Assemble, and establish long-term technical cooperation and business contacts. We now have our very own manufacturing facility and sourcing business. We always base the quality and service standards above the market average standards, so that our company have more hope and competitiveness.

Inquiry

You Might Also Like