High Quality PCBA & PCB Board Manufacturer in Shenzhen

High Quality PCBA & PCB Board Manufacturer in Shenzhen

Shijiazhuang Linke Electronics Tech Co.,Ltd is a high tech company that offers One-Stop services of PCB Board and PCB assembly,our services include PCB design,PCB fabrication,PCB Assembly,Components sourcing,Stencils and PCBA testing.
Chat Now

Product Details

Our firm since its inception, normally regards item top quality as company life, constantly make improvements to generation technology, improve product excellent and repeatedly strengthen organization total good quality management, in strict accordance with the national standard ISO 9001:2000 for electric circuit board, Pcb Assembly Quote, Soldering Circuit Boards. Base upon the presence and look into the future, we will continue to increase our investment and strengthen the management system. We give full play to corporate innovation capabilities and strive to build our products into industry-leading brands.

PCBA Knowledge:

The SMT surface mount process consists of three main steps, solder paste printing, component placement, and reflow soldering.


1. Solder paste printing

The solder paste is a bonding material for connecting the surface-adhesive component circuit boards. First, after the steel plate(PCB stencil) is etched or laser-cut, the solder paste is printed on the solder pads of the circuit board by the squeegee of the printing machine,in order to proceed to the next step.

2. Component placement

Component placement is the key technology and focus of the entire SMT placement process. The process uses high-precision automated placement equipment to accurately place the surface mount components on the pad of the printed circuit board.Due to the increasingly precise design of the surface-adhesive components, the spacing of the pins is also reduced, so the difficulty of the technical level of placement operations is increasing.

3. Reflow soldering

Reflow soldering is a circuit board on which a surface-adhesive component has been placed, which is preheated by a reflow oven to activate the flux, and then the temperature is raised to a needed scientific temperature(the temperature is different by Lead free and no lead free) to melt the solder paste, and the component pins are connected to the solder pads of the circuit board, thencooled to solidify the solder, that is, the surface adhesion component is bonded to the circuit board.(PCB PCBA)


Our Factory:

image001

Certifications:

Our Company is UL,ISO9001,ROHS and GJB9001B certified. 

image007


Packing and Shipping:

1

2

FAQ:

1. How to Get a quotation?

For PCBs,pls send us the Gerber File.For PCBA,pls send us the Gerber file and BOM(Bill of Materials)

2. What is the MOQ?

No MOQ.1 pcs is ok.

3.What is the lead time?

For PCB orders,the lead time is 2 to 10 days.For PCBA orders,the lead time will be 15 to 30 days.

4.Will the boards be tested before shippment?

Yes,all PCBs will be tested by Flying Probe or E-test.For PCBA,we will have AOI,X-ray,and functional test

 


We actively and extensively collect customer needs and promote technological innovation to create high-quality and satisfactory High Quality PCBA & PCB Board Manufacturer in Shenzhen. Our company currently has a high degree of growth in organization and operation, system management, product development, production technology and production equipment. We've our personal manufacturing unit and sourcing business.

Inquiry

You Might Also Like