China Shenzhen OEM EMS Circuit Board Controller PCB PCBA Assembly

China Shenzhen OEM EMS Circuit Board Controller PCB PCBA Assembly

Minimum IC Pitch:0.3mm Minimum BGA Pitch:0.3mm Maximum BGA Size:74mm×74mm Minimum Order Quantity:1 piece
Chat Now

Product Details

Our Fr4 Pcb, Electronic Manufacturings, Electronic Pcb Assembly has a variety of advantages such as fine workmanship, long service life and high cost performance, thus favored by a large number of customers. In today's increasingly progressive technology, our company constantly increases the investment in research and development technology, speeds up the pace of research and development system construction. It is a good way to enhance our products and solutions and repair. Facing the future, we will continue to provide high-quality products and satisfactory services to customers at home and abroad with the entrepreneurial spirit of unlimited innovation and inexhaustible power. Welcome customers all over the word to contact us for getting further business and reliable relationships.

PCBA Knowledge:

Currently widely used PCB boards have excellent electrical properties but poor heat dissipation. As a heat dissipation method for highly heat-generating components, it is almost impossible to expect heat to be conducted by the PCB itself, but to dissipate heat from the surface of the component to the surrounding air. However, as electronic products have entered the era of component miniaturization, high-density mounting, and high-heat assembly, it is not enough to dissipate heat only by the surface of the component. At the same time, due to the large number of components mounted on the PCB circuit board surface, a large amount of heat generated by the components is transferred to the PCB. Therefore, the best way to solve the heat dissipation is to improve the heat dissipation capability of the PCB itself.

Due to the poor thermal conductivity of the resin in the PCB sheet, and the copper foil lines and holes are good conductors of heat, increasing the copper foil residual rate and increasing the heat conduction holes are the main means of heat dissipation.

Welcome to use ems pcb assembly services from Linke Electronics.

 

PCBA Process:

 图片1

 

Our Factory Show:

 

图片2_副本 

 

Certifications:

Our Company is UL,ISO9001,ROHS and GJB9001B certified. 

 

图片6_副本 

 

Packing and Shipping:

 

图片4_副本 

FAQ:

1. How to Get a quotation?

For PCBs,please send us the Gerber File.For PCBA,please send us the Gerber file and BOM(Bill of Materials)

2. What is the MOQ?

No MOQ.1 pcs is ok.

3.What is the lead time?

For PCB orders,the lead time is 2 to 10 days.For PCBA orders,the lead time will be 15 to 30 days.

4.Will the boards be tested before shippment?

Yes,all PCBs will be tested by Flying Probe or E-test.For PCBA,we will have AOI,X-ray,and functional test

If you need a quotation,feel free to send us the Gerber file and BOM,here is our email:admin@brightcircuits.com

 


We strive to make conscientious products and do every detail of the China Shenzhen OEM EMS Circuit Board Controller PCB PCBA Assembly, let users rest assured and continue to create value for customers, thereby achieve the goal of win-win cooperation. We always adhere to the business philosophy of 'efficiency makes the brand, integrity makes the future', and strive to provide customers with high grade, complete and price-competitive products, and guarantee perfect after-sales service. Our company has also strengthened close cooperation with dealers at all levels to achieve zero inventory management for dealers and reduce their risks.
Hot Tags: ems pcb assembly, China, manufacturers, suppliers, factory, custom, service, Electronic Manufacturings, Prototype Circuit Board, Pcb Fab And Assembly, Eagle Pcb, cheap circuit board, blank printed circuit board

Inquiry

You Might Also Like